Q1 Deployment Highlight: 150kW Peak Warehouse Installation

A look inside our recent deployment for a logistics center in Accra, utilizing 450W Monocrystalline panels and high-voltage three-phase inverters.

Q1 Deployment Highlight: 150kW Peak Warehouse Installation

Our engineering team successfully commissioned a robust 150kWp system for a major cold-storage warehouse facility in Tema last month.

The facility required an uninterrupted power supply to maintain specific thermal baselines for perishable goods. To achieve this, we utilized an array of 330 high-efficiency 450W PERC Monocrystalline panels mounted on a custom aluminum ballast structure.

Power management is handled by three 50kW Deye Hybrid Three-Phase Inverters functioning in parallel seamlessly. The deployment passed all rigorous stress-test audits and is currently operating at 98% efficiency.

connect_without_contact

Interested in this?

Contact our engineering team to see how these architectures can be applied to your specific operational needs.